![]() |
PMC BioTec | 中文 |
![]() |
||
AFCSM System Phased Project Development Phase 1: If initial economic analysis warrants, respirometric sample analysis is performed. This will provide a “snap shot” confirmation of compatibility with AFC technology, a preliminary PFD, envelope footprint and a plus/minus 40% project budget. Phase 2: A two to four month bench pilot is often warranted. This will allow for reactor acclimation and understanding of wastewater characteristics over a representative timeframe. It will provide the data required to determined design loadings and operational strategy for chemical treatment. At this stage, we will establish performance guarantee parameters, provide a PFD, unit operation sizing, mass balance, and plus/minus 25% project budget (full installed system and O&M cost). Phase 3: Phase 4: Phase 5: Phase 6: PMC BioTec patented wastewater and sludge treatment technologies: AFCsm process; the Biomass-to-Energy (AFC BioFuelssm) process; and the e-FFECT ElectroChemsm process, and BioFlexsm.
|
|
| PMC BioTec - 309 Commerce Drive, Suite 200 - Exton, PA 19341 - phone: 610 524.6364 - sales@pmcbiotec.com |