CASE
HISTORY: UK Pharmaceutical Manufacturing Company Challenge • The facility also desired to implement treatment and prevent off-site release of target compounds that were manufactured at the plant. Solution • An extended and detailed VE (Value Engineering) study was completed by an independent Consultant and verified the selection of the AFC process is easily the most cost effective option. Bottom Line • System has been in operation from October 2002 to Present • Off-site disposal of sludge has been virtually eliminated • Facility will be compliant with EU land disposal regulations and ban against disposal of organics in landfills • GMO discharges were radically reduced
|
|