CASE
HISTORY: Pharmaceutical Company (United States) Challenge Solution Bottom Line • Full-scale system has been on-line for more than six years achieving 99% COD removal with almost no sludge production saving about $1.0 million/year in hauling costs. • Effluent COD from the system is less than 50 mg/L with a feed COD of almost 30,000 mg/L after almost three years of operation. Effluent BOD is non-detect with an influent BOD over 17,000 mg/L. |
|